Location: 205 Queen Street, Auckland
Builders: Cachet Group
Architects: Cachet Group
Duraplan Scope:
- 2 x Toilet Cubicle Partitions in the Altitude Range
- 5 x Shower Cubicle Partitions in the Altitude Range, including a full height screen and shower seat in each
- 23 x 2-Tier Locker Units
- 18 x 3-Tier Locker Units
- Bench Seating around the lockers
Home to two high-rise towers in downtown Auckland, the End of Trip facility at 205 Queen Street has been upgraded to a lively and attractive space with premium facilities. Duraplan Systems enjoyed watching this space come to life and we were excited to be involved in the fitout and completion of the End of Trip facility. Working alongside Cachet Group, the Duraplan team supplied & installed the Cubicle Partitioning in our full height Altitude Range, and completed the fitout for the Lockers and Bench Seating in our DuraSafe and DuraLine Ranges. Now completed, this End of Trip facility has a newly refurbished shower and bathroom space which incorporates soft curved joinery, timber cubicle partitions, and back-lit mirrors that allow the space to impersonate a large shared space despite the small floorplate.